
Low voltage switchboards
We select them against your single-line diagram, certified and type-tested to IEC 61439-1. They arrive ready to install, with the delivery date committed in writing.
From the single-line diagram to installation conditions: organize information for engineering discussions and compare proposals with the same scope.
AMAR Colombia ·

Two similarly sized switchboards may satisfy different requirements. Before comparing prices, agree on the equipment's function, what the proposed supply includes and how its correspondence with the project will be verified.
A comparable proposal identifies references, scope, exclusions and documentation. Clarify whether it includes supply, integration, installation or commissioning, and who defines and verifies interfaces with the installation. A commercial image does not replace a technical data sheet.
Record clarifications in a single requirements version. If a load or installation condition changes, review the engineering impact before retaining the selected reference. This discipline reduces ambiguity between designers, suppliers and installers.

We select them against your single-line diagram, certified and type-tested to IEC 61439-1. They arrive ready to install, with the delivery date committed in writing.

Switching and protection for your substation, in SF6 and air — the SF6 ones are Siemens. All of them factory-assembled and type-tested.
Preventive maintenance: from routine to reliability
Safety starts before intervention
Data that actually helps protect assets
Contact AMARMaintenance · Reliability · Safety · Switchboards · Digitalization