Prepare inventories, work orders and indicators so a digital tool supports decisions and preserves each asset's technical context.
AMAR Colombia ·

If one asset appears under three names, its failures and costs are scattered across incomparable records. Assign a stable identifier and connect location, function, reference and documents. Preserve history when a part changes; do not confuse asset identity with a replaceable component.
The form should capture what is needed to reconstruct work and make a decision. A photograph without context, an alarm without an owner or a required field always filled with 'other' are signals to review record design.
Before comparing MTBF or MTTR, define the window, included assets and what failure and repair mean. A classification change can move the indicator without improving equipment. Store the criteria with the result so another person can repeat the calculation.
Start with one asset family and a review process. Check that orders can be found, owners receive findings and decisions are recorded. Scale when that chain works. The goal is protecting operations with useful information, not filling a dashboard with charts.

We select them against your single-line diagram, certified and type-tested to IEC 61439-1. They arrive ready to install, with the delivery date committed in writing.

Dry-type and oil transformers, gensets and UPS. We import directly, so the price doesn't pass through three middlemen.
Preventive maintenance: from routine to reliability
A good switchboard starts with good requirements
Safety starts before intervention