Bogotá Metro
2500 A busways for the Bogotá Metro project.
Client: Fábrica BYB
- Current
- 2500 A
Explore AMAR Colombia projects with busways, switchboards, switchgear and electrical substations for construction, industry and institutions. Scope and delivery.
2500 A busways for the Bogotá Metro project.
Client: Fábrica BYB
1300 A busway for the residential tower.
Client: Constructora Valderrama
800 A busways for the SENA Multisector Centre, Santander region.
Client: LFCM Ingeniería
1600 A busway for the water treatment plant.
Client: Fábrica BYB
1300 A busway for the district laboratories.
Client: Fábrica BYB
Supply of floor-standing cabinets for the Fusion 93 project.
Client: Damasco Proyectos y Construcciones
Supply of an 800 KVA substation and busways for Paladio phase 2.
Client: Redingel Ltda
Supply of materials and structures for Condominio Portobello.
Client: IMB Inversiones Muba
Supply of low voltage distribution boards, transformer enclosure and SF6 switchgear.
Client: Gutiérrez Castro Arquitectos
Supply of low voltage switchboards, a transformer, transformer enclosure and air-insulated medium voltage switchgear.
Client: Mointec Ingenieros
Supply of SF6 switchgear, a 1000 KVA transformer, transformer enclosure and low voltage distribution boards.
Client: IMB Inversiones Muba
Supply of medium voltage SF6 incoming, outgoing and protection switchgear.
Client: Grados Ingeniería
Supply of a 1600 KVA substation, low voltage distribution boards, metering switchgear and transfer switches.
Client: MEL Montajes Eléctricos López
Supply of medium voltage switchgear and a transfer switch for the police station.
Client: Consorcio San Gabriel
Supply of electrical materials, wiring and lighting for the PTAR Yumbo wastewater treatment plant.
Client: Consorcio PTAR Yumbo
Supply and installation of 576 m² of solar panels, inverters, batteries and support structures.
Client: SME Estructuras
Supply and installation of a 125 KVA substation, transformer and transformer enclosure.
Client: IELSEG Soluciones de Ingeniería
Supply of a 300 KVA substation, 300 KVA transformer, air-insulated transformer enclosure, distribution boards and a 125 KVA generator.
Client: Mointec Ingenieros
Supply and installation of a 300 KVA substation, low voltage switchboards, medium voltage switchgear and transformer.
Client: 3M Ingenieros
Supply of a generator, UPS, substation, SF6 switchgear and distribution boards.
Client: FOG Ingeniería
Supply of distribution boards, electrical cable and conduit.
Client: CONINGELEC SAS
Supply of transformers for La Nacional de Licores.
2500 A busways for San Antonio Hospital in Mitú.
Supply of electrical materials, wiring, switching equipment and conduit for Multi Sport Multiplaza.
+57 312 475 1389 · info@amarcolombia.com
WeWork Building, Carrera 19 #100-45, Bogotá
Request an appointment Monday to Friday, 9:00 am to 5:00 pm Colombia time, excluding Colombian public holidays. Subject to confirmation via WhatsApp.